Key Projects

9 Mile Run | Arlington National Cemetery | Delaware Water Gap | Highland Park | Mahoning Creek | Miakonda Boy Scout Camp, Toledo, Ohio | North Park | Seaboard | Seneca Reservation, Irving, NY | Oak Openings | Starpointe | Tacony Creek | Texas A&M Landfill | Texas A&M Gardens | Toledo Botanical Gardens | University of Toledo | Warsaw, Virginia | Washington Park | XTO

Ecological Restoration, Inc. was retained to install engineered rock structures. We constructed rock large engineered riffles, many bendway weirs, stacked stone bank protection, keyways and other rock structures.

Another urban stream with extreme mood swings. This stream can go from a trickle to 20 feet in depth in minutes. Another contractor had created various large rock structures using boulders at a cost of millions of dollars. Soon after construction, over 40 of the 50 structures failed. Ecological Restoration, Inc. was retained to repair the structures. We completed the job with minimal budget under the direction of Dave Derrick. It took two separate mobilizations. We constructed rock large engineered riffles, many bendway weirs, stacked stone bank protection, keyways and other rock structures under Mr. Derrick?s direction. Since then, the stream has continued to flood periodically and there have no adverse issues. We worked directly under the Nine Mile Run Watershed Association for this project. They were very pleased with the results.

Nine Mile Run PDF
Nine Mile Run

Click on the images below to view a larger display.

9 Mile Run
Photo 1
9 Mile Run
Photo 2
9 Mile Run
Photo 3
9 Mile Run
Photo 4
 
9 Mile Run
Photo 5
9 Mile Run
Photo 6
9 Mile Run
Photo 7
9 Mile Run
Photo 8
 
9 Mile Run
Photo 9
9 Mile Run
Photo 10
9 Mile Run
Photo 11
 
Contact Us
To ensure the security of your information, we ask that you type the code (displayed below) in the text box.