Key Projects
We designed and built these projects in Bushkill Creek, Dingman's Creek and the Delaware River within the park. In Bushkill Creek, the project included construction of large bendway weirs/keyways, a stacked-stone wall, Longitudinal Peaked Stone Toe Protection (LPSTP), soil wraps with coir matting and live vegetation and coir/biolog bank treatment. In Dingmans Creek we restored two sections of the stream with various rock structures and plantings. Along the banks of the Delaware River, we enhanced a wetland area and restored the banks in a huge washout. Underdrains, keyways, live siltation, coir matting and coir logs were used. This work was completed for the National Park Service and Corps of Engineers.
Click on the images below to view a larger display.
|